List of Improvements:

Basic infrastructure

- Copper plumbing 1993, 2000, 2004
- Complete rewiring 2000. Partial existing hard conduit, partial flex steel conduit.
- Attic R30 Insulation - Some exterior walls insulated R13 (mostly in addition, office)
- City of Glendale permitted and approved earthquake retrofit incl. shear walls, have county certificate
- Partial floor insulation 2004 - master suite, second bedroom, boy's bath - Roof 1996; addition roof 2004
- Thermostatically controlled gable ventillation fans
- 200 Amp service, 1994
- Permitted and approved by COG.


Other items - infrastructure


- All windows (ex. one closet) completely replaced incl. jambs to double pane.
- Hard wired smoke detectors
- Recirculating hot water pump
- New 75 gal water heater 2004.
- New central HVAC system, I think 3 ton, would need to check, 2003. All asbestos materials remediated
- Attic ladder.

Remodels

- Kitchen remodel 1994, complete; gutted to studs, new electrical, appliances, plumbing, gas piping, recessed lights, oak cabinets, granite countertops, second sink, themed lights, insulation, gypsum drywall, french door, touch lighting controls, paver style high-fire tiles. Permitted and approved by COG.
- Office (third bedroom) remodel 2003, incl. built-in solid oak and oak veneer bookcases and custom closet, integration of HVAC return, Internet/TV/Telephone wiring to desks, hardwood flooring patched to match.
- Second bedroom closet remodeled from old bathroom location. (more below) 2004 .

Additions (all permitted and approved by COG)

- Second bathroom - relocation in addition 2004. Relocated period sink fixture; built new bath using premium fixtures, bath hardware, etc. Mimic'ed period tilework.
- Second bedroom with foyer 2004 - wall to wall carpet, recessed lights, tilework, exterior lights
- Master Bedroom & bathroom, toilet room 2005 - complete tear-off of side of house to studs; complete new wiring, plumbing, drain service, electrical, bath & toilet vents, etc. Premium bath fixtures - tub, sinks, faucets, etc. Additional electric sockets behind drawers for hair dryers. Walk-in shower. Recessed lights & themed light over tub, sconce lighting. Premium solid oak and oak veneer cabinets and limestone countertops. Custom stonework throughout. Wall-to-wall carpet with custom tile border, outswing french door. Tub on GFI circuits and is bonded.
- Rear deck 2005 - trex surface
- Themed gate 1999 - custom woodwork, metalwork, engineering

Design Details

- Period milk door
- Period telephone nook
- Period fireplace with batchelder style details; works; verified and updated after 1994 northridge quake (no damage)
- Custom kitchen full-extension pull out drawers, lazy susan cabinet, storage for cookie sheets
- Kitchen desk with custom cabinet, storage for telephone books, cook books, etc.
- Low profile basement access
- Many archways throughout original and remodel/addition areas